Last week we took over one of the most expensive special vehicles in our fleet. An important part of the set is the hydraulic arm (crane), which enables the vehicle to independently stack and unload goods. These special vehicles are mainly used for the distribution of heavy loads to places where there is no other equipment for unloading goods. For example, we can deliver construction materials directly to construction sites and, as needed, unload them on the floor, transfer them over other buildings, or put them in a place further away from the vehicle.